Showing posts with label Lydia Crescent Shawl. Show all posts
Showing posts with label Lydia Crescent Shawl. Show all posts

Thursday, 14 June 2012

Lydia Crescent Shawl Completed

I have completed Lydia Crescent Shawl! Now it just needs to be blocked, very heavily blocked. I was a little disappointed that the points were not more prominent. Blocking will help with this. The lace work at the moment just looks like a frill.
I spent most of the day at Fobbles, at the Get Together. Before I went I had a corking headache, which left me in two minds as whether to go or not. Two Co-codamol later and I went. By mid afternoon I needed to take more. I decided to have a break off lace tonight and worked on the ASJ. I have just under two ridges to do before I put the neck stitches onto a holder.
005
I have also wound up the skein of yarn that I got from the Woolclip, back in March. I fell in love again with the colours - purples, pinks and turquoises. Perhaps that might be the next project yarn. Normally as I am finishing one project, I have in mind what I am doing next. Not so in this case. Sensibility tonight told me to do the ASJ, what with the headaches n'all. Perhaps when my head is clearer I'll just make an instant decision as to what the next big thing will be. I'm not ready for that decision at the moment. Or do I need to finish the ASJ - or at least a significant amount of it?!
I have acquired today some crochet thread. It is very fine - 20, 50 and 60 to those in the crochet know! I am wanting to do doileys with it. I have also done a few more rounds of EZ PI. I am liking the yarn increasingly, the more I do of it. The colours are coming though better as well. I will try and take a decent photo in day light.

Tuesday, 12 June 2012

Lydia Crescent Not Quite Completed

Just a short one tonight. It's past my bed time and my daily tiredness is upon me. I have been organising myself for the WI meeting tomorrow night, so I haven't finished Lydia Crescent tonight as I'd hoped. I have two more rows to do then cast off. The rows have a little over 520 stitches, not surprising really that I've not got many rows done - lots of stitches though! I think I have had a stray stitch or may be two, somewhere along the last three rows. Never mind, It doesn't seem to show at the moment. Hopefully tomorrow it will be done. Tomorrow night is WI night, so I shall try not to get overly anticipatory of completion.

Saturday, 9 June 2012

Lydia Crescent Shawl On The Go Again

Mary-Jane had an unsettled evening again last night. We are now trying a new ploy of only going into her once, then letting her cry (as long as it not a 'there is something the matter' cry). It is very difficult to sit and listen to her cry and scream, but she has to learn that playing with Mommy and Daddy on their bed during the night is not preferable to sleeping. She has been restless in her sleep this evening so far. There has been quite a few times I have heard her murmer, held my breath and thought she would awaken.

Last night I cracked on a bit more with Pi Shawl. I made the increases to 288 stitches and did three knit rounds. Over the course of today, I have been thinking more about having a shawl to wear (and show off) at the Woolfest. I had a look at for a few small ones, then decided to see how I got on with Lydai Crescent Shawl. I put this down a while ago as I was too weary and not able to concentrate on it. On the back of the spiral doily and continuing with Pi Shawl, I thought that I will finish Lydai rather than start another.

I then hit a bit of a mental block. As I had to stop Lydia previously, I got to think that it was going to be too difficult to do. I challenged this thought. I looked at the picture of the shawl - which had been modelled inside out in the pictures of the magazine - and looked at the pattern. The lace work was easy to remember - the repeats were around 11 items long, including 4 yarn overs. So not too bad.

I sorted where I was, made sure that I hadn't left an mistake for correcting and started knitting. I have done five rows and now have 481 stitches. The stitch count goes up to 528. I have 17 rows to do in just over a week and a half, and that is giving me a day or two to block it. Easy. That may also allow for unsettled evenings as well.

Oh and I have been given a tip of how to down load more pictures without having to pay or upgrade or anthing daft like that. It is a bit late now to ge trying it, hopefully over the enxt day or two!